防火卷帘门测量设计的详细说明!

发布人:http://www.kdjlm.com    发布时间:2019-06-04 10:03:28

  防火卷帘门广泛应用于商业建筑、厂房和地下车库,具体测量设计细节如下:

  Fire-proof rolling shutter doors are widely used in commercial buildings, factories and underground garages. Details of measurement and design are as follows:

  测量设计:

  Measurement design:

  步骤一:窗帘安装的一般分类

  Step 1: General Classification of Curtain Installation

  1. 它可以分为:

  1. It can be divided into:

  在装具上,即卷帘两侧导轨安装在建筑洞口内侧,即安装后的门洞有效净宽度为原门洞减去两根导轨的宽度(200*2),一般见两根建筑立柱之间的安装。

  On the fixture, the guide rails on both sides of the curtain are installed inside the entrance of the building, that is, the effective net width of the entrance after installation is the width of the original entrance minus the width of the two guide rails (200*2). Generally, the installation between the two building pillars is seen.

  侧安装,即卷帘门两侧导轨安装在建筑物外孔,即安装后的门洞有效净宽度为原门洞的宽度,一般见墙体开开门安装卷帘门。

  Side installation, that is, the guide rail on both sides of the curtain door is installed in the outer hole of the building, that is, the effective net width of the installed door hole is the width of the original door hole, generally see the wall open door to install the curtain door.

  边缘媒介机构,即卷帘两侧导轨安装在建筑物内孔边同时,安装在楼洞外的另一边,也就是说门孔安装后是有效的净宽度是原始门孔的宽度减去导轨(200 * 1),常见的看到不规则建筑列或安装孔之间。

  Edge media mechanism, that is, the guide rail on both sides of the curtain is installed at the side of the inner hole of the building and at the same time on the other side of the outside hole of the building. That is to say, the effective net width of the door hole after installation is the width of the original door hole minus the guide rail (200 * 1). It is common to see the irregular building row or between the installation holes.

20161214807515.jpg

  2. 按垂直或高低排列:

  2. Arrange vertically or vertically:

  梁上:即卷帘门后的门头悬挂在原建筑的门洞上方,通常门头高度为400mm。

  Beam: That is, the door head behind the curtain door is suspended above the door of the original building, usually the height of the door head is 400 mm.

  梁下:即卷帘门头悬挂在原建筑门洞底部。门头高度一般为400mm。实际有效净高为原建筑洞口高度减去门洞高度(这点应特别注意)。

  Under the beam: that is, the curtain door head is suspended at the bottom of the original building doorway. The height of the door head is generally 400 mm. The actual effective net height is the height of the original building entrance minus the height of the entrance (which should be paid special attention to).

  第二步:检查场景

  Step 2: Check the scenario

  1、要查看卷帘门现场安装的建筑结构,根据实际情况做出卷帘门的种类选择,要求安装牢固的两端机头板和导轨。对于双轨双帘的安装,要考虑两端导轨的安装厚度必须达到400mm,主风琴板的厚度为900mm。

  1. To inspect the construction structure of the rolling curtain door installed on the spot, make the choice of the type of rolling curtain door according to the actual situation, and require the installation of solid two-end machine head plate and guide rail. For the installation of double-track and double-curtain, it is necessary to consider that the installation thickness of the guide rail at both ends must reach 400 mm, and the thickness of the main organ board should be 900 mm.

  2,水、电和其他管道桥线框必须通过百叶窗孔,可以经常练习是安装管道桥宽边的线框门,管的一侧用砖头和石头之前窄门孔测量;或将管道桥架线顶门板安装在门顶,减小门头的安装位置,降低门的有效高度,用防火卷帘材料密封后,有效防止火灾的蔓延。

  2. The wireframe of water, electricity and other pipeline bridges must pass through shutter holes. It can often be practiced to install wireframe doors with wide edges of pipeline bridges. The narrow gate holes in front of bricks and stones are used to measure one side of the pipeline bridges; or to install the roof of the pipeline bridges on the top of the door to reduce the installation position of the doors, reduce the effective height of the doors, and effectively prevent the spread of fires after sealing with fire-proof rolling curtain materials.

  3.确定机头板两端的设计安装和导轨的位置后,开始用卷尺测量门洞。宽度=导轨两端背面之间的距离,高度=从地面到机头板顶部的距离。如果是介质安装,则需要安装并密封。宽度=快门宽度,高度=建筑物顶部到导轨顶部的距离+50mm。

  3. After determining the design and installation of the two ends of the head plate and the position of the guide rail, the tape measure of the door hole is started. Width = the distance between the back of both ends of the guide rail and height = the distance from the ground to the top of the nose plate. If the medium is installed, it needs to be installed and sealed. Width = shutter width, height = distance from building top to rail top + 50mm.

  4,为不规则建筑入口,坚定地安装在两端的鼻子板应充分考虑导轨(或双导轨)安装位置后,借材料,如砖、角钢、H钢加固,或支持宽度或高度只切断狭窄安装宽度或高度诉诸砌块砌筑或防火材料。

  4. For the entrance of irregular buildings, the noseboard firmly installed at both ends should take full account of the installation position of guide rails (or double guideways), borrow materials such as bricks, angle steels, H steel reinforcement, or support width or height only to cut off narrow installation width or height to resort to block masonry or fireproof materials.