  1、轨道的安装

  1. Installation of track

  根据门板的宽度和高度来确定两轨道固定性的位置并用水平管测水平,再用M8×41㎜的方头螺钉固定好。用卷尺来测准水平轨与墙壁以及两水平轨之间的间距,用水平尺测准水平轨的水平,然后再用M6.4×14㎜的小帽螺丝和六角螺帽将水平轨连接件与水平轨和轨道固定性连接的固定。用带眼的角钢制成两个三角架,然后再将与水平轨的末端用M6.4×14㎜的小帽螺丝、螺帽连接,并且用M8×70㎜的膨胀螺栓固定好到天棚或者是墙壁上。

  According to the width and height of the door plate, the fixed position of the two rails is determined and the level is measured by the horizontal tube. Then the fixed position is fixed by the square head screw of M8 *41. The distance between the horizontal rail and the wall and between the two horizontal rails is measured by tape gauge, and the level of the horizontal rail is measured by level gauge. Then the horizontal rail connector is fixed with the fixed connection of the horizontal rail and the track by small cap screw and hexagonal nut of M6.4*14_. Two triangles are made of angle steel with eyelets, and then the end of the horizontal rail is connected with small cap bolts and nuts of M6.4*14_, and fixed to the ceiling or wall with expansion bolts of M8*70_.

  2、扭簧的安装

  2. Installation of torsion spring

  将扭簧的中心支架、尼龙胶圈、固定法兰、与门体的重量相匹配的扭簧、锁紧法兰、绕线轮、轴承的支架要按顺序(分清左右侧)套在镀锌钢管上,并注意到各个的零部件是否安装的正确。用M8×41㎜的方头螺钉将扭簧的中心支架固定到洞口上部中间的位置短木板上,并注意到避开链盒的安装的位置。用M8×40㎜的螺栓将扭簧中心支架、尼龙胶圈、固定好法兰和扭簧连接,再将扭簧和锁紧法兰连接。然后再将轴承的支架下端用M9.5×19㎜的大帽螺丝和螺帽与水平轨连接件连接固定好,轴承的支架上端用M8×41㎜的方头螺钉固定到侧木框上。

  The center bracket of torsion spring, nylon rubber ring, fixed flange, torsion spring matching the weight of door body, locking flange, winding wheel and bearing bracket should be set on galvanized steel pipe in sequence (distinguishing left and right sides), and attention should be paid to whether the parts are installed correctly. The center bracket of the torsion spring is fixed to the short wooden board in the middle of the upper part of the hole with the square head screw of M8*41_, and the installation position of the chain box is avoided. The center bracket of torsion spring, nylon rubber ring, fixed flange and torsion spring are connected with M8*40_bolt, and then the torsion spring and locking flange are connected. Then the lower end of the bearing bracket is connected and fixed with the horizontal rail connector with the big cap screw and nut of M9.5 *19. The upper end of the bearing bracket is fixed to the side wood frame with the square head screw of M8 *41.

20161214807515.jpg

  3、门板的安装

  3. Installation of door panel

  将底密封条放到底门板的底部,并且用M4×16㎜或是M6.4×16㎜的自攻钉将其从背面固定好到门板上。将底轮的支架放到门板的两侧近底密封条的位置,1#折页分别放到门板的顶部左中右三个位置上(宽度要低于10英尺,中间的位置是一个;宽度在10英尺至14英尺,中间的位置是二个;宽度在15英尺至18英尺,中间的位置是三个),并且分别用了M6.4×16㎜的自攻钉固定。然后再将滚轮涂上甘油穿入底轮的支架和1#折页中,将此门板放到立好的轨道里并使其水平。将2#折页、3#折页、4#折页、顶轮的支架按照顺序分别固定在各块门板顶部的左右的位置,各块门板中间的位置连接采用了1#折页。将各块门板按顺序放到已立好的轨道里,用M6.4×16㎜的自攻钉连接各折页与各门板,使各块门板组合成为一体。

  Place the bottom sealing strip at the bottom of the bottom door plate and fix it from the back to the door plate with M4 *16_or M6.4 *16_self-tapping nails. Place the bottom wheel bracket on the two sides of the door panel near the bottom sealing strip. Place 165507 。 Then the rollers are coated with glycerin and put into the bottom wheel bracket and 1# folder, and the door panel is placed in the erected track and leveled. The brackets of 2, 3, 4, and the top wheel are fixed at the left and right positions of the top of each door plate in order, and the middle position of each door plate is connected by 1 folding. The door panels are placed in the established track in sequence, and the folded sheets and the door panels are connected with the self-tapping nails of M6.4 *16, so that the door panels are combined into one.

  4、扭簧的上劲

  4. Strength of torsion spring

  将钢丝绳带环的一端套在底轮的支架钩轴上。按照规定上劲表给扭簧上劲,不要超过或是低于规定圈数的半圈,别住钢棍,将钢丝绳的另一端挂在绕线的轮上,绷紧钢丝绳,锁住绕线轮,再锁住锁紧的法兰,撤下别住的钢棍。此过程具有极大的危险性,必须注意安全哟,既要保护好自己,又要避免到伤及他人哟。

  The end of the wire rope belt ring is sleeved on the support hook axle of the bottom wheel. According to the regulations, the torsion spring should be strengthened by the strength meter. Do not exceed or lower than half of the prescribed circles. Don't hold the steel rod, hang the other end of the wire rope on the winding wheel, tighten the wire rope, lock the winding wheel, then lock the locked flange, and remove the remaining steel rod. This process is extremely dangerous, we must pay attention to safety, not only to protect ourselves, but also to avoid harming others.

  5、调整

  5, adjustment

  用手将门升降数次,观察门体的运行是否平稳,扭簧的力量是否适当,然后再做具体的调整并紧固好各连接部分的螺丝。

  The door is lifted and lowered several times by hand to observe whether the door body is running smoothly and the strength of the torsion spring is appropriate. Then the screw of each connection is adjusted and tightened.

  6、电机的安装

  6. Installation of motor

  将链盒与电机连接并且固定好。将链盒的前端U形架固定到扭簧的中心支架上面的木板上并居中,连接的链盒。用带眼的角钢做成“∏”支架,下端与电机用M8连接固定好,上端要用两个M8×70㎜的膨胀螺栓固定到天棚的上。用M6.4×16㎜的自攻钉将钩座固定到顶门板顶部的中间的位置上,连接钩子。接上电源,观察电机运行的情况,调整上下的行程。

  Connect the chain box to the motor and fix it. The front end U-shaped frame of the chain box is fixed to the wooden board above the central bracket of the torsion spring and centered to connect the chain box. The "bracket is made of angle steel with eyelets. The lower end is connected with the motor by M8, and the upper end is fixed to the ceiling by two M8 70_expansion bolts. The hook base is fixed to the middle position of the top of the top door plate with the self-tapping nail of M6.4 *16, and the hook is connected. Connect the power supply, observe the operation of the motor, adjust the up and down journey.

  7、布线

  7, wiring

  用Φ1.0线径的白色护套线,从电机的尾部电动的开关接线端子中引出,顺着电机的吊架布到洞口的左侧距地面1.2 M处,每隔500㎜钉一个线卡子,然后再接上手动的开关。布线要横平竖直,既美观又合理。

  A white sheath with a diameter of 1.0 is used to lead from the switch terminal of the electric motor at the tail of the motor. Following the suspension cloth of the motor to the left side of the hole 1.2M from the ground, a wire clip is nailed at 500_intervals, and then a manual switch is connected. Wiring should be horizontal and vertical, beautiful and reasonable.

  8、提手的安装

  8. Installation of Handles

  提手应安装在底门板上,左右居中,横向中心线与方格的下端边缘线要对齐。

  The handle should be installed on the bottom door plate, centered left and right, and the horizontal center line should be aligned with the lower edge line of the square.

  9、锁的安装

  9. Lock Installation

  锁眼要用专门的开孔器,开在从下往上数的第三块门板中心的位置,安装的时候锁槽一律向下,背帽一定要拧紧哟。

  The keyhole should be opened at the center of the third door panel from bottom to top with a special opener. When installing, the lock groove should be all downward, and the back cap must be tightened.

  以上内容是济南卷帘门的小编为大家整理提供,如需了解更多知识请及时跟我们联系,或者点击我们的官网进行咨询:http://www.kdjlm.com

  The above content is a small edition of Jinan curtain door for you to collate and provide, if you need more knowledge, please contact us in time, or click on our official website for consultation: http://www.kdjlm.com.